|
|
|
|
Subject: | CHARLESTON SC DAILY PORT UPDATE | Date: | Tuesday, June 21, 2011 | Priority: | Normal | Notice: | PORT LIMITS/INFORMATION ------------------------ Maximum Depths - (Fresh) Harbor Entrance - 47.0 ft Main Channel - 45.0 ft
BERTH LIMITS/INFORMATION: ------------------------- Current maximum drafts allowed at berths:
Hess - Max draft - 40'00 Delfin - Max Draft - 42'00 Chem Marine - Max Draft - 38'00 MLW Kinder Morgan - berth 1 - 40'00 Kinder Morgan - berth 2 - 40'00 Kinder Morgan - berth 3 - 30'00" Kinder Morgan - berth 4 - Max draft 40'00, tide needed for anything deeper than 38'00 BP - Max draft 30'00" Low water / Salt Wando Terminal - Max draft 43'00 MLW - tide neede for anything deeper than 43'01" Max BM No restriction North Charleston Terminal - Max draft 45'00 MLW - Max BM No restriction CST - Max draft 45'00 MLW - Max BM No restrictions Veterans Terminal 35' MLW tidal restricted Nucor - Max draft 25'00 (movements daylight & tidal restricted), Max LOA 550', Max Beam 52'
Per pilots - restrictions for Tanker movements: Drafts of 38'00 or less may transit at anytime Drafts of 38'01 to 40'00 - window: Start in 1 Hour before low water until 2 hours before high water Drafts of 40'01 to 41'00 - window: start in 2 hours after low water until 2 hours before high water Drafts of 41'01 to 42'00 - window: start in 3 hours after low water until 3 hours before high water
=============================================
VESSEL TRAFFIC:
BB - T/B INTEGRITY/650-4 ETA 2100/21ST KMI4 - ARCTIC BLIZZARD - ETA 0915/23RD ============================================ FEDERAL, STATE & LOCAL FILING REQUIREMENTS: ---------------------------------------------
96 Hours - advance notice of arrival required by USCG
48 Hours - advance receipt of crew list by Immigration for any vessel arriving from a foreign port, or arriving coast wise with detained crew.
24 Hours (minimum) - Foreign cargo must have manifest submitted to Customs & Border Patrol AMS. Bond must be filed for Foreign flag vessels or U.S. flag arriving with foreign cargo aboard. 24 Hours - advance notice to Pilots
24 Hours - advance fax of crew list and approved visitors required by Terminal.
72 Hours - post port call, the Port Authority requires bill of lading figures for all bulk cargo.
Port Security - All persons doing business within Port Authority property must have security pass from SCPA. All persons wanting unescorted access to any vessel must have a valid TWIC.
============================================================
Current Articles:
Timeline halved for study of ship channel deepening By David Slade dslade@postandcourier.com Tuesday, June 21, 2011
A crucial study on the feasibility of deepening the Charleston shipping channel could be completed in just four years, or half the previous estimate, the U.S. Army Corps of Engineers' Charleston District commander said Monday.
Lt. Col. Jason A. Kirk gave no specifics about what changed the timeline, but said that after meetings in Washington, D.C., last week his agency adopted an aggressive goal of completing the study by late 2015. He spoke at a signing ceremony in Charleston that marked the beginning of the channel-deepening study.
The State Ports Authority wants to see the channel dredged to a depth of 50 feet at low tide, to accommodate larger container ships. The official channel depth is currently 45 feet, and going 5 feet deeper could take a decade and cost about $310 million, the Corps has estimated.
The feasibility study that begins now, following Monday's contract- signing between the Corps and the SPA, will look at what depth is appropriate and what going deeper would mean for wildlife, drinking water supplies and other considerations.
With both U.S. senators from South Carolina present along with hundreds of guests at the ceremony, it was clear that many believe the launch of the study will lead to the desired outcome, but questions remain.
The $300,000 committed so far -- $150,000 each from the federal government and the SPA -- represents a fraction of the entire project cost. The small amount of federal funding was crucial because it allowed the study to begin, but that's just a start.
"We have to get this funding every year, for multiple years, to make this a reality," said Jim Newsome, the SPA's chief executive officer.
Sen. Lindsey Graham, R-S.C., pledged that the state's delegation would work across party lines, "Republicans and Democrats, Libertarians and vegetarians," to assure additional funding for the port.
Fellow Republican Sen. Jim DeMint, whose opposition to congressional earmarks has at times been seen as an impediment to obtaining funding for the project, said he wants the port to win additional federal money through a merit-based system that would rank port projects. Such a system does not now exist.
"One way or another we'll have to find a way to do it without earmarks," DeMint said.
Related story Port, Army Corps to begin harbor dredging study, published 6/20/11 Earmarks are the nickname for federal funding that members of Congress insert into budgets, usually for projects in their districts, outside of the usual review process. The "reconnaissance" phase of the channel- deepening project, which concluded that deepening the channel could produce $106 million in annual benefits to the nation, was funded with an earmark,
Now, the feasibility study, and the availability of continuing federal funding, will determine if the plan to deepen the channel moves forward.
The feasibility study had been estimated by the Corps to require five to eight years, with six more years of work needed for design and construction of the channel deepening, for a total timeline of 11 to 14 years. The new estimate calling for a four-year study brings the Corps' timeline in synch with the 10-year estimates members of Congress have been using.
Reach David Slade at 937-5552.
============================================================
CURRENT ISSUES: 06/21/11 - 1000 - SCSPA BOARD OF DIRECTORS 06/23/11 - 0818 - NAVOPS MEETING - HURRICANE PREPAREDNESS
FUTURE/ONGOING ISSUES: 08/03/11 - 0830 - MARSEC 3 TRAINING EXCERCISE 2018 - ETA FOR NEW CHARLESTON PORT TERMINAL TO BE COMPLETED
===========================================================
SECURITY LEVEL: MARSEC 1
===========================================================
CURRENT HURRICANE STATUS - 4 - SEASONAL - NO STORMS EXPECTED
=================================================================== Tides for Charleston (Customhouse Wharf) starting with June 21, 2011. Day High Tide Height Sunrise Moon Time % Moon /Low Time Feet Sunset Visible
Tu 21 High 12:33 AM 5.3 6:12 AM Set 11:51 AM 74 21 Low 6:49 AM 0.3 8:31 PM 21 High 12:57 PM 4.8 21 Low 7:03 PM 0.9
W 22 High 1:17 AM 5.0 6:12 AM Rise 12:22 AM 65 22 Low 7:32 AM 0.4 8:31 PM Set 12:45 PM 22 High 1:46 PM 4.9 22 Low 7:55 PM 1.1
Th 23 High 2:02 AM 4.8 6:12 AM Rise 12:50 AM 55 23 Low 8:16 AM 0.4 8:31 PM Set 1:39 PM 23 High 2:35 PM 4.9 23 Low 8:50 PM 1.2
F 24 High 2:50 AM 4.6 6:13 AM Rise 1:19 AM 46 24 Low 9:01 AM 0.5 8:31 PM Set 2:33 PM 24 High 3:25 PM 5.1 24 Low 9:46 PM 1.2
Sa 25 High 3:40 AM 4.5 6:13 AM Rise 1:50 AM 37 25 Low 9:47 AM 0.4 8:31 PM Set 3:27 PM 25 High 4:16 PM 5.2 25 Low 10:41 PM 1.1
Su 26 High 4:31 AM 4.4 6:13 AM Rise 2:23 AM 28 26 Low 10:36 AM 0.4 8:32 PM Set 4:24 PM 26 High 5:05 PM 5.4 26 Low 11:34 PM 1.0
M 27 High 5:22 AM 4.4 6:14 AM Rise 3:01 AM 19 27 Low 11:24 AM 0.3 8:32 PM Set 5:21 PM 27 High 5:54 PM 5.6
Tu 28 Low 12:24 AM 0.8 6:14 AM Rise 3:43 AM 12 28 High 6:13 AM 4.5 8:32 PM Set 6:17 PM 28 Low 12:13 PM 0.1 28 High 6:41 PM 5.8
W 29 Low 1:11 AM 0.6 6:14 AM Rise 4:32 AM 6 29 High 7:01 AM 4.6 8:32 PM Set 7:12 PM 29 Low 1:00 PM 0.0 29 High 7:27 PM 6.0
Th 30 Low 1:56 AM 0.4 6:15 AM Rise 5:28 AM 2 30 High 7:49 AM 4.7 8:32 PM Set 8:04 PM 30 Low 1:47 PM -0.2 30 High 8:12 PM 6.1
F 1 Low 2:40 AM 0.2 6:15 AM Rise 6:28 AM 0 1 High 8:35 AM 4.8 8:32 PM Set 8:52 PM 1 Low 2:34 PM -0.3 1 High 8:55 PM 6.2
Sa 2 Low 3:23 AM 0.0 6:16 AM Rise 7:32 AM 0 2 High 9:21 AM 4.9 8:32 PM Set 9:35 PM 2 Low 3:21 PM -0.3 2 High 9:39 PM 6.2
Su 3 Low 4:07 AM -0.1 6:16 AM Rise 8:38 AM 2 3 High 10:08 AM 5.0 8:32 PM Set 10:14 PM 3 Low 4:10 PM -0.3 3 High 10:23 PM 6.2
M 4 Low 4:52 AM -0.2 6:16 AM Rise 9:44 AM 7 4 High 10:56 AM 5.2 8:32 PM Set 10:51 PM 4 Low 5:01 PM -0.2 4 High 11:09 PM 6.1 ============================================================= OFFSHORE WATERS FORECAST NWS OCEAN PREDICTION CENTER WASHINGTON DC 500 AM EDT TUE JUN 21 2011 W CENTRAL N ATLC CONTINENTAL SHELF AND SLOPE WATERS BEYOND 20 NM TO 250 NM OFFSHORE...INCLUDING S OF GEORGES BANK FROM 1000 FM TO 250 NM OFFSHORE. SEAS GIVEN AS SIGNIFICANT WAVE HEIGHT...WHICH IS THE AVERAGE HEIGHT OF THE HIGHEST 1/3 OF THE WAVES. INDIVIDUAL WAVES MAY BE MORE THAN TWICE THE SIGNIFICANT WAVE HEIGHT. ANZ088-211500- CAPE FEAR TO 31N OUT TO 32N 73W TO 31N 74W 500 AM EDT TUE JUN 21 2011
TODAY W TO SW WINDS 10 TO 15 KT...EXCEPT E OF 1000 FM 10 KT OR LESS. SEAS 2 TO 5 FT...HIGHEST E. ISOLATED SHOWERS AND TSTMS. AREAS OF SMOKE.
TONIGHT AND WED SW WINDS 10 TO 15 KT. SEAS 3 TO 4 FT. ISOLATED SHOWERS AND TSTMS.
WED NIGHT THROUGH SAT SW WINDS 15 TO 20 KT. SEAS 4 TO 6 FT. ISOLATED SHOWERS AND TSTMS W OF 76W WED NIGHT.
| Notice posted on Tuesday, June 21, 2011 | | Disclaimer For quality assurance purposes please note well that while the above information is regularly vetted for accuracy it is not intended to replace the local knowledge or expertise pertaining to port conditions of our marine operations personnel. Port précis should always be verified by contacting the corresponding marine department of a particular location for the most up-to-date information.
|
|
|
|
|